4.9/5 from 1,900+ reviews
Free delivery · Average 3.2 working days30-day returns
Free delivery · Average 3.2 working days4.9/5 from 1,900+ reviews30-day returns
Basket

European Mattress Pocket Sprung Medium

€369 RRP €459 Save €90

Free delivery · Get it Tue 27 Oct to Mon 2 Nov

Medium firmness

In stock

Secure checkoutVisa Mastercard Apple Pay Google Pay PayPalKlarnaShop Pay American Express Maestro
“Great matter , love it!”Verified CustomerMore reviews

Bed & Mattress Sizes

SizeImperialDimensions (cm)
Small Single2'6"75 × 190
Single3'0"90 × 190
Small Double4'0"120 × 190
Double4'6"135 × 190
King5'0"150 × 200
Super King6'0"180 × 200

Always measure your bed frame before ordering a mattress. Dimensions are nominal and may vary slightly by product.

Product details

27cm Pillow Top Mattress

- Swirled button-tufted mattress cover with 2.5cm Egg-Shaped Foam perfectly contours to your body, absorbs noise and vibration, allows for superior airflow and distributes body heat away for ultimate restfulness

Medium to Firm Mattress

- pillow top mattress is made in and fully compliant with CertiPUR-US certification. With multiple foam layers and hundreds of individual pocket springs, this hybrid mattress is soft enough to be comfortable yet firm enough to be supportive, ideal for side, back and stomach sleepers

Excellent Combination

- High-density memory foam layers encourage air circulation, and pocket springs provide zoned support. The independent retraction performance conforms to the body weight curve, offering you a comfortable sleeping experience

Mattress-in-a-Box

- For your convenience, mattress is compressed rolled, and you can easily move it and set it up in your room. Our mattress is suited for kids beds, bunk beds, spare rooms, guest beds, lofts, apartments

Just take your time, relax, and enjoy your sleep with

Dimensions and specifications

Specifications

  • Item weight: 22 Kilograms
  • Item firmness description: Medium
  • Top style: Pillow Top
  • Cover material: Polyester Blend or Polyester or Cotton
  • Number of layers: 2
  • Fill material: Memory Foam
  • Special features: Hypoallergenic, Orthopedic, Pillow-Top
  • Mattress Coil Type: Pocketed Coil
  • Construction Type: Foam, Pocket Spring, Hybrid

Details by option

Small Single (80 x 200cm)

  • Size: European Small Single (80 x 200 x 27 cm)
  • Product dimensions: 2L x 0.8W x 0.27Th metres
  • Item weight: 19.48 Kilograms
  • Top style: Tufted
  • Cover material: Faux Suede
  • Number of layers: 4
  • Construction Type: Memory Foam, Pocket Spring
  • Number of Mattress Coils: 500

Delivery and returns

  • Free delivery to the Republic of Ireland and Northern Ireland, no minimum spend.
  • Average delivery time: 3.2 working days. Based on JSHOP deliveries in the last 30 days, updated daily.
  • 30-day returns. Read our Delivery & Returns policy.
  • Questions about this item? Email us, we reply 7 days a week.

Questions and answers

Is delivery free to all of Ireland, including Northern Ireland?
Yes. Delivery is free to all 32 counties, in the Republic of Ireland and Northern Ireland, with no minimum spend. The delivery dates for this item are shown under the price.
Can I return it?
Most items can be returned within 30 days of delivery, unused and in the original packaging (flat-pack furniture unassembled). Email us first and we send you the return details. For a change of mind, the return postage is paid by you. If an item arrives damaged or faulty, we replace, repair or refund it at no cost to you.
How can I pay?
Visa, Mastercard, Apple Pay, Google Pay, PayPal, Klarna or Revolut Pay, through a secure checkout.

Customer reviews

4.6 out of 5 · Excellent

4 reviews shown · 1,593 ratings in total

Trevor B.Verified Customer

Sleep in peace

I was not completely sure whether this was going to be one of those things you regret buying ...in other words, okay but not really great.

Lara C.Verified Customer

sleeping on a cloud

soooo comfy, really reasonably priced. Nice height, firm but also squishy/soft!

Verified Customer

Great comfort at incredible value

So very comfortable, slept on it at B&B on a Monday, i ordered 1 for home as soon as i was home, GREAT value as well as a quality product

Verified Customer

Great matter , love it!

Delivered on time and looks exactly like the picture. Easy to assemble and very comfortable. Very happy with Project Beds. Would recommend.

About our ratings

Ratings and reviews are collected from this product's listing on a major online marketplace.

4.9

1,900+ reviews from customers all over Ireland

Jon Clarke★★★★★ Verified Customer
Great communication, fast shipping and product is as described. I can highly recommend this seller.
micknato★★★★★ Verified Customer
One of the fastest and most efficient sellers I've had the pleasure to deal with. Appreciate your help.
julieconroy101★★★★★ Verified Customer
Great seller, 100% recommend, very efficient service, great customer service and communication and prompt delivery. Product was as advertised.
Lorraine Byrne Farrell★★★★★ Verified Customer
Fantastic service. Arrived Easter Sunday, in excellent condition. Thank you.

Read all 1,900+ reviews